Steel Stud Framing
ALC employs a full-time BIM specialist to work on all of our framing projects. Our BIM specialist works with the building model, customer and other trades to coordinate the interior and exterior framing components of our projects long before our crews arrive on site. When our crews arrive, our materials are pre-planned and coordinated to eliminate cutting, waste and safety hazards on site. ALC has already worked with the mechanical trades to ensure as many problems and obstacles to productivity and safety as possible have been eliminated before we start on the project. ALC also uses the Hilti PLT 300 layout system on all of our framing projects. Our project layout is 100% GPS and laser-accurate to ensure our jobs are done right the first time.